Primeberg technology

COMPRESS7 — Composite Pressing Technology by Primeberg

Primeberg’s own technology, certified in Ukraine. The tile is pressed into insulation with a density from 17 kg/m³ under extreme pressure of up to 7 atmospheres. The technology covers 7 key production stages of a complete facade system that combines efficient insulation with premium appearance.

Bond strength confirmed in the laboratory

The strength of the bond between the cladding and the insulation base of Primeberg panels has been confirmed by certification tests.

0.19 MPa average bond strength confirmed in the laboratory
2.4× higher than the minimum requirement of 0.08 MPa
0.21 MPa maximum result recorded for Primeberg panels
7 atm maximum pressing pressure on every panel

Bond strength between the cladding and the insulation base, MPa

Minimum requirement 0.08
Primeberg — average 0.19
Primeberg — maximum result 0.21

Bond strength data: certification test report for Primeberg panels No. R/26/02/02-1. Certified technology: certificate of conformity UA.10393.00036-26. Original documents in Ukrainian.

What the number 7 means

The 7 in the name stands for the working pressure in the pneumatic system of our press — up to 7 atmospheres. The tile is pressed in by four powerful pneumatic cushions, designed specifically for Primeberg’s production requirements.

This system applies even pressure across the whole panel while the one-component polyurethane adhesive foams and cures.

Insulation with a density from 17 kg/m³

COMPRESS7 requires insulation with a density from 17 kg/m³. The reason is the high load during pressing: only a dense base can withstand pressure of up to 7 atmospheres. COMPRESS7 is not used on EPS90 and EPS80 — panels on these bases are made with our standard pressing technology.

COMPRESS7 is used EPS100 · EPS100 Graphite · EPS150 Aqua
COMPRESS7 is not used EPS90 · EPS80

The density requirement is a core part of COMPRESS7: it lets the base take the full pressing pressure without losing its shape.

How a COMPRESS7 panel is made

  1. Cutting and profiling the insulation The production cycle starts with precise cutting and profiling of the insulation base, with a density from 17 kg/m³, on CNC machines built for Primeberg’s needs.
  2. Preparing the cladding The tiles go through incoming inspection and preparation. Tiles for corner and other special elements are cut on professional equipment to the required geometry.
  3. Acclimatisation Before pressing, the prepared components are stored and acclimatised under controlled temperature and humidity.
  4. Assembly and adhesive application In the pressing workshop, the panel is assembled and the one-component polyurethane adhesive is applied.
  5. COMPRESS7 pressing Four pneumatic cushions press the cladding into the base evenly across the whole panel at up to 7 atmospheres. As it foams, the adhesive penetrates the structure of the expanded polystyrene and cures under pressure.
  6. Acclimatisation of the finished element After pressing, the finished elements are stored and acclimatised under controlled temperature and humidity.
  7. Quality control At the final stage, every finished element passes quality control, and only then are the panels shipped to customers.

A base with a density from 17 kg/m³, precise profiling, controlled preparation of materials, a one-component polyurethane adhesive that penetrates the base and powerful press equipment together form a solid composite structure with precise geometry, stable properties and a reliable bond between the cladding and the insulation base.

Key takeaway

The performance of COMPRESS7 is confirmed by laboratory tests of bond strength between the cladding and the insulation base. The average laboratory-confirmed value for Primeberg panels is 0.19 MPa — 2.4 times higher than the minimum requirement of 0.08 MPa. The maximum recorded result is 0.21 MPa.

COMPRESS7 is therefore not just a marketing name for a production process. It is a set of technical solutions whose effectiveness is confirmed by laboratory tests.